Florida Condo Milestone Inspections and SIRS: Transaction Step 24

by Rebecca Redman-Hamaoui

A condo can look perfect on a showing and still carry a repair bill the listing photos never mention. Florida law now requires many condo associations to inspect their buildings on a schedule and to plan reserves around the parts that keep a building standing. This is Step 24 of the Bella Trae Realty Florida Transaction How-To series. It explains, as of November 2026, what a milestone inspection and a structural integrity reserve study (SIRS) are, which buildings need them, and how to read both before your review window closes. Step 22 covered the full condo document packet. This post goes deeper on these two reports.

Start With One Question: How Many Stories?

Both requirements turn on building height. Under Section 553.899 of the 2026 Florida Statutes, a milestone inspection applies to a residential condo or co-op building that is three habitable stories or more in height, as determined by the Florida Building Code. The DBPR Division of Florida Condominiums, Timeshares, and Mobile Homes applies the same three-story line to the SIRS. The milestone statute does not apply to single-family, two-family, three-family or four-family dwellings with three or fewer habitable stories above ground.

If you are shopping condos in Kissimmee, ChampionsGate, Davenport or Dr. Phillips, ask early how many habitable stories the building has and when its certificate of occupancy was issued. Those two answers tell you which reports to expect in the packet.

The Milestone Inspection: Phase One and Phase Two

As of November 2026, the statute requires a milestone inspection by December 31 of the year a covered building reaches 30 years of age, based on the certificate of occupancy date, and every 10 years after that. A local building department may set 25 years instead when local conditions, such as proximity to salt water, call for it. A licensed Florida architect or engineer performs it.

Phase one is a visual examination of the building and a qualitative assessment of its structural condition. If the inspector sees no signs of substantial structural deterioration, the inspection stops there. If they do, phase two follows, and it can include destructive or nondestructive testing. After a phase two report, the statute requires repairs for substantial structural deterioration to be commenced within 365 days, and local governments set their own timeframes within that limit.

The association must give every owner a copy of the inspector-prepared summary within 45 days of receiving the report, post the summary on the property, and publish the full report and summary on its website if it is required to have one.

The SIRS: A Funding Plan for the Building's Bones

A milestone inspection looks at condition today. A SIRS looks at what the building will need to repair or replace, and how much money the association should set aside each year to pay for it. Per DBPR, a SIRS covers the roof, structural systems, fireproofing and fire protection, plumbing, electrical systems, waterproofing and exterior painting, windows and exterior doors, and certain other high-cost items that affect structural integrity. It must be performed by a licensed engineer or architect or by a credentialed reserve specialist, and redone at least every 10 years.

DBPR states that unit owner-controlled associations existing on or before July 1, 2022 had to complete a SIRS by December 31, 2025. An association whose milestone inspection is due on or before December 31, 2026 may complete both together, but the SIRS may not be completed after December 31, 2026. For budgets adopted on or after January 1, 2025, DBPR says associations may not waive SIRS reserves. That is why many owners have seen assessments change: the reserve line in the budget now has to follow the study.

What You Are Entitled to Before You Commit

Under Section 718.503 as of November 2026, a buyer under contract for a resale condo is entitled, at the seller's expense, to the inspector-prepared milestone summary if one applies and to the association's most recent SIRS, or a statement that one has not been completed. Resale contracts entered after December 31, 2024 must also say in conspicuous type whether the association is required to have these reports and whether they are done.

When the reports are complete, the resale contract gives the buyer a right to cancel by written notice within 7 days, excluding weekends and legal holidays, after signing and receiving the reports, unless they were provided more than 7 such days before signing. Your contract and condo rider control the details, so read them with your agent and, where needed, a Florida real estate attorney.

How to Read the Two Reports Together

You do not need an engineering degree to get value from these documents. Work through them in this order:

  • Milestone summary: Did phase one find substantial structural deterioration? If a phase two was required, what repairs did it recommend, and have they been scheduled or started?
  • SIRS date and preparer: When was it completed, and by whom? A study done before a major repair or loan may need an update.
  • Budget versus study: Compare the reserve contribution in the current budget with the funding schedule the SIRS recommends for each item.
  • Board minutes: Look for talk of special assessments, loans or projects that have been put off.
  • Who pays what: If a special assessment is adopted or proposed, confirm in writing whether the seller or the buyer is responsible.

DBPR also publishes a SIRS Reporting Database listing associations that have reported a completed study. It is a useful cross-check, though it does not replace the study itself.

We Read the Packet With You

Bella Trae Realty helps buyers in Winter Garden, Kissimmee, ChampionsGate, Davenport and across Central Florida track condo deadlines and ask the association the right questions before a review window runs out. If a report raises a question about structure, we point you to the right licensed professional to answer it. If you are weighing a condo purchase, contact Bella Trae Realty today and we will walk through the documents with you.

Up Next

On Friday, our Florida Real Estate, Defined series explains DTI, LTV and the three numbers your lender watches. Next Monday, Step 25 covers binding homeowners insurance before a Florida closing.

This article is general education, not legal, tax or lending advice. Confirm current figures and program rules with a licensed Florida professional.